Power — Trend Project Planning

Industry

Power.

Generation, networks, renewables — one schedule that holds the interfaces.

Electricity jobs fail the schedule when generation, connection, transmission, and balance-of-plant do not share one logic. Renewables and storage add long-lead equipment, grid dates, and outage windows that cannot sit as open ends.

We plan those jobs in Primavera for contractors, delivery partners, and owners who hold or accept the master schedule. Same craft as our other engineering work. You keep the file.

What the schedule has to carry

Renewables and storage
Solar, wind, and battery packages, with the long-lead items named in the file.
Transmission and substations
Network upgrades where the outage window is a real calendar, not a wish.
Generation packages
Heavy electrical work with a commissioning sequence the site can update.
Connection and interfaces
Programs where the grid date is real, and open ends are treated as questions.

Where the three levels show up

  • Project planning is one plant, one package, or one tender schedule you can bid or baseline.
  • Integrated planning is when electrical, civils, and commissioning each hold a plan.
  • Portfolio planning is several power or network jobs in one view, once the underlying schedules are sound.

Not in this offer

  • A guaranteed first-power or cut-over date.
  • A claim result, or a forensic analysis bundled into the planning fee.
  • An estimate of the capital cost, or the Primavera licence.